Productivity Improvements

Category : Useful Stuff

Productivity Improvements, how to achieve massive reductions in set-up times and implement methods that will save you money year on year.

Productivity Improvements
Is all this 5s stuff just a posh person telling us to tidy up

A few years back I worked for a company that supplied pressure control systems to the oil and gas industry.

It all started off with some very expensive Inconel components that were getting scrapped at an alarming rate. It’s a very long story and I won’t bore you with the minutiae.

To cut the story short, the part was on a large WFL Machine Tool and me and a team of engineers studied the production method for several weeks before coming up with the answers.

There was a list a mile long of all the bullshit reasons why these parts were going wrong. The real answers were something totally different.

  1. Machine needed properly re-aligning.
  2. Chucks, steady and tailstock needed full re-furb.
  3. Machine was being crashed on a regular basis.

In fact the machine had been bumped more times than I’ve had hot dinners.

Now I’ve not had that many hot dinners because my mother was always playing bingo and couldn’t be arsed to cook.

Mind you she could sling a mean bag of crisps at you. Oh, and her pot noodles were amazing, so long as we didn’t mind boiling the kettle and adding the water yourself.

We considered this a small price to pay for an otherwise nutritious meal.

The ultimate gourmet meal

Anyway, we asked the operators, in a meeting, how many times the machine was bumped.

“Oh, not many” one said.

“But how many? once a day, once a week, once a month?”

“No, no probably not even every month” was the final answer.

Not happy with this we monitored the machine and kept a log of everything. Turns out the machine was getting minor shunts all day long and bigger bumps at least every week.

We analysed all these “little accidents” and almost eliminated the problem through good training and creating an open honest environment where the operators felt comfortable, honestly reporting any problems or collisions.

Virtually no bumps a bit like these posh women you see with Range Rovers. I mean you see these Range Rovers on TOP GEAR and they can climb up a fuckin mountain upside down at 90mph.

Range Rover

As soon as you meet one of these on a country road guess what? They won’t even move over into a puddle for fear of wetting the fuckin tyres.

These bastards should be banned from the roads a complete waste of space.

Envious Me?

Oh, and don’t think I’m envious. I don’t want to drive around in a luxury vehicle with every creature comfort known to man at my fingertips. With beautiful leather interior. Music softly tinkling from the top-quality, high end, hi fi system.

0 to 60 quicker than a fuckin snow leopard. Room for the family and two dogs. Quietly purring through the rolling countryside.

I should get that front wing repaired

Fuck off I’ll stick with my car thanks very much. It has everything I need. A bit of a tidy up that’s all it needs.

More Ranting

Just one more rant. Near where I live I often have to pass through quite a long country road that’s only really big enough for one car in most places.

How many people can’t fuckin reverse? I mean holy bleedin shit these cars are bristling with technology, cameras, sensors, cruise missiles air conditioned seats. But guess what, the bloke forgot to equip it with a fuckin reverse gear.

They’ll never back up. They sit there looking at you like you just pissed on their sodding Weetabix.

One very dark night, me and this bloke, had to get out of our cars and actually walk behind this car to help the “person” reverse.

If I’d paid 80,000 quid for a car I’d want it to take to the air and fly over oncoming vehicles. This one just didn’t like going backwards.

Anyway, Here’s What We Did

What I’m about to tell you wouldn’t be practical in most companies. You must bear in mind that the cycle time for these parts was around eight hours and the material cost alone would constitute a decent lottery win.

In The Event Of A Collision

  1. We machined a ready programmed standard test piece on the machine.
  2. We fully inspected it with the machine probing system.
  3. It was checked on a CMM (Coordinate Measuring Machine)
  4.  We were really nice to the perpetrator (it’s so nice that you crashed the machine and gave us this opportunity to learn)

If the test piece was OK at the machine probe stage we would allow production to continue. This was a calculated risk but obviously if it went on to fail the next stage we would stop production immediately.

This job had some massive ups and downs but the final outcome was a massive success. It all came down to basic engineering principles. By carefully scrutinising the problem and systematically eliminating each error we got good parts.

Making permanent changes to working practices so that the lessons learnt could be implemented all over the company.

 

The guys I worked with are still in touch and we earned massive respect for one another.

Qualifications Don’t Matter and It’s Clever to Swear

At the beginning when one of them told me he was a black belt I kept thinking he would beat the shit out of me if I upset him.

Turns out it was a six-sigma black belt and this is quite benign in terms of physical fighting skills.

Six Sigma Black Belt (when angry)

Everyone who knows me knows that my approach is very pragmatic, that means no bullshit to the less articulate.

I would say we need to do this this and this and they would say oh you mean “an overtly incontinent productivity enlightened anal bleaching scheme”

I would agree pretending I knew exactly what they meant.

Unfortunately, I don’t usually have a name for what I want to do.

You know the sort of thing; an untidy workshop I call a fuckin shithole.

They’d say “Dave it needs 5s”.

I said “you’ll need about sixty S’s to clean up this horrendous crap hole”.

“Oh, and please don’t call me Dave, it’s David”

Productivity Improvements

We concluded between us that what they had learnt in college and on courses gaining black belts and all sorts of stuff. I had picked up from working in the real world with real people. Putting the two together made a winning combination.

I still can’t see the point in a black belt unless you get to beat the fuck out of someone but I think maybe I’ve seen too many Bond movies.

CNC Productivity Improvements:

I am sure you have noticed that more time is lost during set-up time than at any other time in your component life-cycle.
Very often a company will ask me to look at the cycle times on components. On close inspection most of their time is lost during the set-up process.

Wall Clock

I may be in a company training programmers or machine training but I will poke my nose into everything and maybe suggest that we take a look at CNC Productivity Improvements.

Small Batch High Quality Parts

Manufacturing in the UK is tending to move towards lower batch quantity due to lower production costs aboard. We are moving more and more towards low volume high quality parts. This means CNC Productivity Improvements are desperately needed because a much larger percentage of manufacturing time is concentrated on set-up times.

Productivity Improvements

If you are only making six parts you can almost guarantee that the CNC set up time will be where all the time is used up. If you can’t guarantee repeat business then I am afraid it gets worse.
Unfortunately we rarely have the situation as it was in the past. We could spend months refining production methods to recoup it all when the job went into production for five years CNC set up time is then amortised.


The problem is when we are setting our CNC Machine we tend to lose control. Predicted CNC set-up times are not met or even worse we didn’t know what they were in the first place.

Productivity Improvements, Do this now:

  • Keep good records of every job you ever do.
  • Knowledge is power but with history we can improve and build.

You may have already machined a very similar part so this will make quoting easy.

Filling Cabinet

Rules For Life

The methods we employ at The CNC Training Centre are rules for life. Take a look at this video on how to set a vice without clocking it. This is a classic example of something that, once it is implemented, is the gift that keeps on giving and that’s what we want.

Productivity Improvements

The way you set a CNC component is crucial.

Does the following Sound Familiar:

Great we set a job on our CNC Machine really fast and in no time, we get a part into inspection.

Just need a pass off and away we go.

Inspector “everything is ok just a few minor adjustments”
A week later we are still adjusting.

Confused

So, what went wrong?

My guess would be:

  • Job not carefully planned.
  •  CNC Prove-out method is wrong.
  •  Incorrect and inaccurate CNC tool setting.
  •  Not using a systematic approach.
  •  Poor feedback from quality department who might not understand exactly how the job was machined.
  •  The CNC set-up needs to be systematic and accurate.
  •  Each step of the way should be correct and complete before the next stage is undertaken.

This can be taught and it can be written into an SOP (Standard Operating Procedure) which can be used again and again.
It sounds perverse but I would be suspicious of anyone who sets a job on a CNC Machine too quickly.


Productivity Improvements, No Blame

My pet hate (and you have loads when you get to my age) is when supervisors blame setter operators for long set-up times. “You’re the boss mate what are you doing about it?”

Telling off
If you ask someone, and I frequently do, why it took so long to set a job. They can never tell you. But if you look carefully you will find that most of the wasted time is looking for things.

Also it’s not actually his fault so you just fired him when you should have resigned yourself.


I want to bolt down my vice.

Question: Where is the vice?
Answer: Under the bench somewhere. (5 minutes)

Question: Is it clean?
Answer: No fuckin way I even had to stone some dents out of the bottom. (10 minutes)

Question:  Where are all the rags?
Answer: Dunno mate go and get some more form the stores. (6 minutes)

Question: We got any tee nuts?
Answer: Go and ask Tom (15 minutes), oh and he told me about his cats hernia operation and gender transformation.

Question: These tee nuts don’t fit, do you know what size they are?
Answer: Go and ask Tom (10 minutes)

Question: Is this vice far enough over on the table?
Answer: No the machine just over travelled you’ll have to start again. (10 minutes)

This took nearly an hour. Then the boss comes down and really pisses you off cos he wants to know when the job will be off the machine.
I am doing my absolute best but everything is going wrong. The thing is this is all the bosses fault. Now I have an attitude problem to boot.


What you should do:

  1.  Plan the job meticulously and get everyone involved.
  2.  Do a proper contract review to check you have everything, and I will repeat, everything that you need. (Real attention to detail is needed here.)
  3.  If you have CAD CAM check everything in the virtual world. Carefull check CNC Code for obvious errors. Mistakes found at this stage cost little nothing to put right.
  4. Now if you are the one running this show. Make sure everything is at the side of the machine before your customer starts work. Your customer being the guy who actually makes something (the machinist).
  5. Check condition of everything, look for damage or anything that slows things down.
  6.  Don’t leave anything to chance, think that you do not want him to leave the duck board unless he needs food, drink or a piss. Make him a cup of tea if he wants one and don’t forget the biscuits.
  7.  Work area. You already know this stuff. Everything should be in a clearly marked place. Only what is needed, no more. Definitely not a full set of Allen keys just the ones you need and I bet it’s a maximum of four.
  8. As a supervisor or manager you are an overhead, a non producer. If you take the dents out of the vice the machine doesn’t stop. When the setter operator does this the machine probably will be stopped.
  9. Try and get the machine operator involved in the preparation but make sure his machine never stops.

“King Rollo’s Playroom”

Maybe you need to check out the story of “King Rollo’s Playroom” before he made some CNC Productivity Improvements.

I will summarise it for those who were deprived of this story as children. In a nut shell he refuses to tidy his play room but then finds that he is tripping over his toys and breaking them and he can’t find anything either.

Not to spoil the story but King Rollo gets really fucked off about breaking his toys and does the right thing and tidies up.
Sound familiar this could be you folks.

CNC Productivity Improvements

Everyone Wants To Work in a Clean Workshop

If you came to my front door in muddy boots and I open the door and you see a pristine immaculate house carpeted in white. What do you do?

You remove your shoes.

But if I opened the door and the house was filthy with straw on the floor you would probably want to wipe your feet on the way out.
The point of this is that if you’re environment is immaculate, anyone coming into it will feel obliged to conform and if they don’t they will stick out like your dirty boot mark on my white carpet.

 Productivity Improvements


Productivity Improvements Investment

Companies very often invest hundreds of thousands in machine tools but refuse to buy more than one 19mm spanner when the operators keep losing them. Daft, you might say, but I bet you are already thinking of similar things in your own company.

The beauty of an outsider doing all this for you (and I would say that) is that they can do all the things you wanted to do but never seem to have the time.

Typically, this is how The CNC Training Centre would help you with CNC Productivity Improvements.

  •  Spend some time (a few days) observing what you do.
  •  This may involve videos and loads of listening to the machinists at the “coal face”.
  •  Meet with managers, supervisors and setter operators and discuss findings. Then you will tell me what we are going to do.
  •  Yes, that’s right you pay me so that you can tell me how you would improve things.
  •  It is true most of the ideas will come from you and the guys on the machine will say “I have been trying to get them to do that for years”
  •  A report is prepared outlining a plan to move forward.
  • Identify training needs and relevant CNC training courses and CNC programming courses if needed.
  • Implement CNC machining process improvement

Then we do it.

Most of this study involves little or no loss to production. The cost of implementing the productivity improvements is usually very low as most of the savings are in very practical low-cost areas.

Productivity Improvement Costs may include:

  • CNC training courses and CNC programming courses.
  • Applications Engineering time to implement CNC Productivity Improvements.
  • Purchasing of inexpensive items such as spanners, clamps, Allen keys etc.

You can expect to see massive reductions in set-up times but above all these times are consistent and predictable. This allows accurate future job costing.

Productivity Improvements

Please note no Range Rover drivers were injured or maimed in the production of this article.

I hope this article inspires you to improve things and get more productive.


G0 Cancels Canned Cycles

G0 Cancels Canned Cycles, this is not a news flash it’s always been the case.

G0 Cancels Canned Cycles

O0001(G28 Example)
(PROGRAMMED BY ANDY MURRAY)
G21 G90 G40

T01 M06(20MM ENDMILL)

G90 G0 G54 X200. Y0 S1500 M3
G43 Z3. H1 M8
G81 G98 Z-5. R1. F100.
X100.
X50.
G0 X25. (No hole drilled here cycle would be cancelled)
G80 (This also cancels the cycle)

“Read More”

G28 G53 Zero Return

G28 G53 Zero Return

CNC Training (Call David: 07834 858 407)

G28 is used to send a machine to Zero return for a tool change or at the end of a program.
G28 G91 Z0                   (Z axis moves up to tool-change)


G28 G91 X0 Y0 Z0        (All three axis move to their respective zero return positions)

I know some of you don’t like three axis moves like the one above. If it don’t hit anything it’s just fine “Get Over It”

Below are the two ways of doing this.

Ignore This If You Get Bored Easily

G28 actually means return to the zero point via a reference point.

If you programmed
G28 G90 Z0 or you forgot the G91 this means return to zero point via a reference point. The reference point is Z0 so the spindle would rapid to Z0 (Bang) and then move up to reference return point.

G28 G53 Zero Return
That’s why if you have single block on you will notice this is two presses of the cycle start (two blocks).

Therefore if we use G28 G91 Z0 the first press will take it to the reference point which is incrementally zero form where you are (no move) the second press move to zero (no collision)

Using G53

Some older machines won’t have this so try not to get over excited.
G53 uses your absolute machine position (Machine) this means all moves are from home position and are not affected by datums (G54 etc) or tool length offsets.

It is one of the very few non modal commands so you can’t write

G53 Z0
X0 Y0 (this will use works offset not G53)
You need to write
G53 Z0
G53 X0 Y0

Advantages Disadvantages (G28 G53 Zero Return)

G28 uses G91 incremental so you must remember to write G90 (absolute) for your next command. In fact many a collision is caused by misuse of G28.

G53 is best if you have it just remember it is non modal.
So you write it in each time you need it.

Note:
Some machines have return to tool change built into the tool change line.
T01 M6


On a Haas machine for example where the return command is built in you would not need to send the Z axis home.
I recommend that you always put one in.
G53 Z0
T01 M6
If you are in single block you can stop before the tool-change if you wish.

Also I know someone who got into the habit of doing this and crashed a Fanuc Controlled machine that needed the command. (If you read this you know who you are)

G53 has another really good use and that is if you want the machine table (on a vertical machining centre) to move to a standard position to do things like changing the parts. It will always put the table in the same place regardless of work offset.

Bare in mind that if you put a position in that is relative to your work offset and not use G53 then the next time you set the fixture up your machine may over-travel because the fixture is in a different place.

If you read this article you will see how it could be used to set a vice in a known position regardless of datum.

Remember G53 is a position from the machine zero, it does not take into account the tool length offset or the datum. The other important thing is that it is non modal. That means you will need it on every line that you wish to use it for.

 

On Machines Like The BMC 800 from Toshiba

Tosnuc 888

This machine has the Tosnuc 888 control.

Tosnuc 888

For this control use G73 instead of G53.

If you have any questions about G28 G53 Zero Return or you are affected or have been affected by any of the issues in this post please contact me 07834 858 407

Please contact me if you require:

  • CNC programming training.
  • Want to learn CNC programming.
  • Fanuc control training.
  • Yasnac programming training.
  • Any type of CNC course.
  • Fanuc training courses
  • CNC lathe training
  • CNC Vertical Machining Centre training

Services offered at CNC Training Centre

Edgecam training.

Classroom programmer training.

Onsite CNC Machine Training.

CNC Training on all controls and machines.

Mazak Training Fanuc Training

Don’t forget we offer training on all types of Mazak Machines and all Fanuc Controls 6m to 31i Oi old to young.


CNC Training Centre Find us on Facebook™

Category : News

You can now find CNC Training Centre on Facebook

Please ‘like’ the channel to follow all the latest news updates and posts. We will be posting to Facebook all the time with new videos absolutely FREE.

Click the ‘Like’ button below or share this information by clicking on ‘share’!

CNC Training Centre Facebook

Call David: 07834 858 407

Services offered at CNC Training Centre

 

Classroom programmer training

Onsite CNC Machine Training

Edgecam training.

CNC Programming and Training on all controls and machines.

Mazak Training Fanuc Training

Don’t forget we offer training on all types of Mazak Machines and all Fanuc Controls 6m to 31i Oi old to young.


Just an address will do…

Category : Haas Mill Haas Turn

Just an address will do

For CNC Training Call David: 07834 858 407

Just an address will do.

When you work on a machine day after day or you work on the same CAD system. I believe that every now and then you need to look at what you are doing and take stock. You know like when you can’t quite get something to work correctly and you find a way to frig it.

Well done you got yourself out of a mess. But hang on a minute that was two years ago. So when you gonna take the time to find out what was the correct way?

It’s time to get off your fat arse and do something about it.

Sometimes when I am training people I feel like I am being really fussy when I pick them up on minor annoying things they do when operating a machine. By the way I don’t mean things like scratching your bollocks.

For example leading zeros (don’t get me going on that).

Right, your on a Fanuc or Haas control and you want to call program one and you type in O0001 and press search or lower cursor.

Just an address will do

No no no!

Just type in O1 that’s all you need. Honestly it drives me bloody bonkers.

Here is an idea just spend one day sorting all these little things out. I tell you now the saving over a year, once you force yourself to do everything the quick way, is massive and it’s there forever.

There is a slow convoluted way and there’s a right way.

Check out the shortcut keys on your favorite bit of software and use em. It’s amazing once you get a grip on it.

How do you copy and paste? You can let me know on that one.

Anyway Enough Ranting This is The Post

Just an address will do when you are typing code into a Haas control. You don’t need to type the zero. How cool is that?

Impress your mates with this one, or better still the boss (you may get a raise…….  not)

Type in G X Y and press input. (This could be in MDI or EDIT mode)

Yes that’s all you need.

It will go in as G00 X0 Y0

These clever Americans can just guess what you are trying to do.

So much easier, one day all controls will be this good.

There you go just an address will do.

Please contact me if you require:

  • CNC programming training.
  • Want to learn CNC programming.
  • Fanuc control training.
  • Yasnac programming training.
  • Any type of CNC course.
  • Fanuc training courses
  • CNC lathe training
  • CNC Vertical Machining Centre training
  • Vasectomy
  • Lawns mowed

Contact David: 07834 858 407

Services offered at CNC Training Centre

Edgecam training.

Classroom programmer training.

Onsite CNC Machine Training.

CNC Training on all controls and machines.

Mazak Training Fanuc Training

Don’t forget we offer training on all types of Mazak Machines and all Fanuc Controls 6m to 31i Oi old to young.


Careers in CNC

View all current vacancies in CNC

Click here

Call David: 07834 858 407